Power Requirements Electrical Specifications: 120V AC, 60Hz. 15A Branch Circuit

Installation Procedure

 

 

WARNING: To avoid electrical shock hazard, before installing,

 

 

switch power off at the service panel and lock the panel to prevent the

 

 

power from being switched on accidentally.

1)

Unpack Hood

Pull hood from outer packaging. Remove and discard all packaging materials.

 

 

Remove filter and set aside (See Use and Care manual for removal instructions).

2)

Prepare ductwork

Install one-way damper so that the flap opens up. Press damper down into the

 

 

blower outlet until it is snug. Note: verify that the flap opens up (toward the ceiling)

 

 

before continuing. See “Prepare Ductwork” on page 4. If necessary, install transi-

 

 

tion, thermal break and additional backdraft damper.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 2: Prepare Ductwork

3) Prepare Wall

See “General Information” on page 2 for recommended installation height and

 

“Mounting Requirements” on page 3 for information on wall requirements.

 

Once the preferred height is determined, draw a line at the vertical centerline of

 

the cooking appliance.

 

Use the installation template to locate and mark the screw holes. Drill 1/4” (6 mm)

 

pilot holes (4 holes for hood screws and 2 holes for chimney screws). Install plugs

English 4

Page 6
Image 6
Bosch Appliances DKE96 installation manual Installation Procedure, Unpack Hood, Prepare ductwork, Prepare Wall