Installation |
Installation Instructions
Supplies Required:
•(3) 3/8" floor anchors and bolts
•Piping to
•Adequate supply pipe supports
•Piping to
•Minimum 4" drain to accommodate 30 gallons per minute discharge for drench shower waste
•OPTIONAL: sign mounting hardware
Step 1: Secure base to floor
1. Install three suitable anchors (by installer) |
for 3/8" bolts in the floor (see Figure 1). |
(273mm)
9" (229mm)
| 9" (229mm) DIA. FLANGE | |
| WITH (3) 3/8"DIA. HOLES | |
ON AN 8" (203mm) | ||
DIA. BOLT CIRCLE | ||
(266mm) | ||
|
2. Bolt the base to the floor anchors using 3/8" |
bolts (supplied by installer). |
Step 2: Assemble eyewash components
1.Assemble the remaining unit components as shown in Figure 2 on page 4.
•Apply pipe sealant or tape (supplied by installer) to all
•Use rubber grip pad or strap wrench around pipes when tightening to prevent marring. Place grip pad on pipe and then put wrench over grip pad. With grip pad in place, turn pipe with wrench.
•The bottom edge of the showerhead should be
2. When connecting steel chain, first connect |
chain to foot treadle “S” hook. Then with |
foot treadle raised up, straighten chain and |
connect a link to “S” hook on valve handle. |
24"
(610mm)
(273mm)
(2160mm)
TO
FLOOR
6" (152mm)
6"
(152mm)
66" (1676mm)
TO
FLOOR
Make sure steel chain is pulled tight. The |
length of chain used will vary. |
IMPORTANT: Do not rely on Bradley’s Combination Unit to support supply piping.
Step 3: Connect water supply
NOTE: All dimensions assume standard thread engagement. Variations in manufacturing allow for +/- 1/8" (3mm) per threaded joint. To find the tolerance of a dimension, add the number of thread joints in between a dimension and multiply it by 1/8" (3mm).
Figure 1
1.Connect water supply piping to
2.Connect drain piping to
3.Hang the safety sign from the unit with the curtain hooks provided (or mount it to the wall using
Bradley Corporation • | 6/26/07 | 3 |