Maintenance and Lubrication

Maintenance is necessary to ensure safe and troublefree lift operation. General preventive maintenance consisting of inspections of your lift system and cleaning the lift should be a part of your routine.

The VL955 has been designed with many self-lubricating compo- nents. Lubricate the pivot points specified on page 34 approxi- mately every four weeks (or 400 cycles) with a light penetrating type oil (30 weight or equivalent). Severe conditions (weather, environment, heavy usage, etc.) may require more frequent lubrication.

Preventive maintenance visual inspections and lubrication procedures do not take the place

of the procedures specified in the Maintenance and Lubrication Schedule provided in the appli- cable lift installation and service manual. The procedures outlined in the Maintenance and Lubrica- tion Schedule must be per- formed at the recommended scheduled intervals by an authorized Braun Corporation service representative who has attended and been certified by The Braun Corporation Sales and Service School.

If the scheduled maintenance and lubrication procedures are not being performed, or if there is any sign of lift damage, wear, abnormal condition or improper operation, discontinue lift use immediately. Contact your sales representative or call The Braun

Corporation at 1-800-THE LIFT. One of our national Product Support representatives will direct you to an authorized service technician who will inspect your lift.

WARNING

Maintenance and lubrication proce- dures must be per- formed by authorized service personnel as specified in the applicable installa- tion/service manual. Failure to do so may result in serious bodily injury and/or property damage.

Page 33

Page 35
Image 35
Braun VL955 manual Maintenance and Lubrication