8
INSTALLATION
B.VERTICALLY WITH NEW CHIMNEY SYSTEM (Refer to Figure 7)
NOTE: Follow
OPTION: To achieve a center vertical installation a 45º elbow and a
OPTION: Install
1.Always maintain 3” clearance from combustible materials. When passing through additional floors or ceilings, always install firestop spacer.
2.After lining up for hole in roof, cut either around or square hole in roof, always 3” larger all the way around pipe. Install upper edge and sides of flashing under roofing materials, nail to the roof along upper edge. Do not nail lower edge. Seal nail heads with
3.Apply
C.VERTICALLY INTO EXISTING CHIMNEY SYSTEM
Adapters are available to adapt from 3”
As an alternative, 3” or 4”
This is the preferred method.
Follow guidelines for equivalent vent length.
D.VERTICALLY INTO EXISTING MASONRY FIREPLACE NOTE: Follow
1.Have the masonry chimney inspected by a qualified chimney sweep or installer to determine its structural condition.
2.You will need a pipe length equal to the chimney height from the hearth. If outside combustion air is to be used, you will need a pipe length equal to the chimney height plus 18 inches.
3.Install a blanking plate and the chimney pipe, and if used the outside air pipe, as shown in Figure 9.
4.Attach the
5.Position the stove, adhering to the clearances in Figures 1 & 2.
6.Measure and build chimney top plate. Cut out holes for chimney pipe, and if used the outside air pipe. Install and seal with
FIGURE 7
FIGURE 8a
FIGURE 8b