NOTE:

UNPLUG CART POWER CORDS FROM POWER SOURCE BEFORE STARTING

TIMER INSTALLATION: 'E-UNIT AT FRONT LOCATION'

SEE DETAIL 'B'

Please read and follow all instructions thoroughly. Bretford will not be held responsible for improper installation or misuse of the timer unit.

bottom shelf

SEE DETAIL 'A'

Step 1

Open both front doors of cart to access E-Units. Unwind any length of E-Unit power cord remaining on the back panel cord wrap brackets. Unclip the power cords from the side panel clips (see DETAIL 'A'). Loosen the screw holding the E-Unit bracket assembly and remove all 4 bracket assemblies (see DETAILS 'A' and 'B').

clip

bracket assembly

bracket assembly

DETAIL 'B'

DETAIL 'A'

Page 25
Image 25
Bretford LAP24EBA manual Timer Installation E-UNIT AT Front Location