offset

front-left

clip

 

front-right

bottom shelf

Step 3

Carefully install replacement E-Unit(s) into position by placing bottom in first against the offset and tilting it in sideways to the top.

When repositioned correctly, the E-Unit(s) power switch should face the front.

Reinstall the E-Unit bracket assemblies (make sure that the top flange of the E-unit is aligned with the slot in the bracket assembly) and tighten screws securely.

From underneath the bottom shelf, feed the E-Unit power cord(s) [plug end] all the way through the bottom rear round grommeted cutout(s) [next to bracket assembly].

Press each E-Unit power cord into the two wire clip(s) located [in line, behind E-Unit] on the bottom of cart. Wind power cord(s) around the cord wrap bracket on the exterior rear panel for storage.

Installation is now complete and ready for use.

Page 19
Image 19
Bretford LAP24EBA manual Offset Front-left Clip Front-right Bottom shelf