TROUBLESHOOTING
Problem | Cause | Correction | |||
Automatic transfer switch does | 1. | Generator breaker open. | 1. | Reset generator circuit breaker. | |
not transfer to generator | 2. | Generator voltage not acceptable. | 2. | Refer to generator manual. | |
|
|
|
|
| |
| 1. | Main distribution panel breaker | 1. | Reset main distribution panel | |
Automatic transfer switch does |
| open. |
| breaker. | |
not transfer to utility | 2. | Utility voltage not acceptable. | 2. | Wait for utility voltage to return to | |
|
|
|
| normal. | |
|
|
| |||
Generator is still running after | Engine cool down period. | Engine will stop after 1 minute. | |||
switch transfers to utility power |
|
|
|
| |
|
|
|
|
| |
| 1. | Minimum engine run time has not | 1. | Wait five minutes for transfer | |
Generator is still running after |
| elapsed. |
| switch to retransfer to utility | |
|
|
| power. | ||
utility power is restored |
|
|
| ||
2. | Fuse(s) in transfer switch is | 2. | Check fuse(s) and replace if | ||
| |||||
|
| defective. |
| necessary. | |
|
|
|
|
|