Broan 273003 warranty Install Ductwork, Install Electrical Wiring, Wiring Diagram, continued

Models: 273003

1 8
Download 8 pages 44.14 Kb
Page 4
Image 4
INSTALL DUCTWORK

INSTALL DUCTWORK

CAUTION - BEFORE CUTTING HOLE IN CABINET FOR DUCT- WORK: Check for interference with floor joists, wall studs, electri- cal wiring or plumbing.

BLOWER

3-1/4" X 10" TO 6" RD.

TRANSITION

SCREWS COLLAR

6" RD.

ELBOW & DUCT-

WORK

INSTALL ELECTRICAL WIRING

(continued)

1.Mount a standard wiring box, with 3-pronged receptacle, inside the cabinet. Make sure the downdraft’s power cord can easily reach it.

2.Run appropriate power cable into cabinet and connect it to receptacle.

3.Plug the downdraft’s power cord into the outlet.

1.Cut hole in cabinet as well as holes in wall or floor as necessary.

2.Mount the roof or wall cap and work back towards the cabinet, attaching all ductwork, elbows and transitions as previously planned. Tape all ductwork connections to make them secure and air tight.

3.Connect ductwork (and transition, if required) to downdraft. If necessary, LOOSEN nuts and screws that hold the blower in place, and slide blower left or right to meet ductwork. Re- tighten screws and nuts.

Note: A 3-1/4" x 10" collar is provided for installers who prefer to rivet the ductwork to the unit. This will allow blower to be removed and replaced easily in service situations without disturbing duct- work.

WIRING DIAGRAM

INSTALL ELECTRICAL WIRING

WARNING: To avoid possible electrical shock, personal injury or death - Disconnect electrical power.

4

Page 4
Image 4
Broan 273003 warranty Install Ductwork, Install Electrical Wiring, Wiring Diagram, continued