PREPARE THE INSTALLATION LOCATION

PREPARE THE INSTALLATION LOCATION

ROOF INSTALLATIONS

PREPARE THE INSTALLATION LOCATION

WALL INSTALLATIONS

1.Locate the blower on the rear slope of the roof. Place it in a location to minimize duct run. The location should be free of obstacles (T.V. leads, electrical lines, etc.). If the blower top is level with the roof peak, it will not be seen from the street. Keep this approximate location in mind as you work from within the attic.

1.Choose a position on the outside wall. Make sure that no wall studs, pipes or wires run through the opening area.

2.From inside, mark and drill a guide hole centered between wall studs.

2. Mark and drill a guide hole centered between roof

Ø

rafters.

 

20"17"

Ø

 

Ø

 

 

 

 

 

18"

 

1¼" dia. hole

 

 

Ø

 

 

Guide hole

 

 

1¼" dia. hole

 

 

3"

1411/16"

(centered between studs)

 

REMOVE SHINGLES

1211/16"

1"

 

 

 

 

RafterRoof

StudWall

 

 

 

RoofRafter

20½"

 

Stud

29½"

 

 

 

 

 

 

 

 

 

 

 

Guide hole

 

 

 

 

 

 

(centered

11" dia.

 

 

11" dia.

 

 

between rafters)

hole

 

REMOVE

Wall

 

 

hole

 

 

 

 

SIDING

 

 

 

 

 

 

 

115

 

 

 

 

 

 

 

 

 

 

 

912 //168"

 

 

 

 

 

 

18"

 

1114135//168""

 

 

 

 

21"

 

 

 

 

25"2"

3.From the outside, use the guide hole as a starting point

to lay out the installation:

3. From the outside, use the guide hole as a starting point

A. Use a T-square to measure 125/8" to the left of the

guide hole, then up 1211/16" to locate the top-left

to lay out the installation:

 

 

 

 

 

 

5

8

corner of the layout.

A. Use a T-square to measure 14 / " to the left of the

guide hole, then up 1411/16" to locate the top-left

B. Starting from the top-left corner, mark the rectangu-

corner of the layout.

 

lar cutout (21" W x 20½" H) and remove only the

 

B. Starting from the top-left corner, mark the rectangu-

shingles in this area.

lar cutout (25" W x 29½" H) and remove only the

C. Mark an 11" diameter hole centered on the guide

siding in this area.

 

hole. Cut this hole through the roof board(s).

 

C. Mark an 11" diameter hole centered on the guide

D. Mark and cut a 1¼" diameter hole through the roof

hole. Cut this hole through the wall.

board(s) where shown.

D. Mark and cut a 1¼" diameter hole through the wall

 

 

 

 

 

 

 

 

 

 

where shown.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

29-1/2"

 

 

 

 

 

2"

 

 

 

 

 

 

 

 

7"

25"2"

4. For flat roof installations, build a curb that will mount the blower at a minimum pitch of 2/12. Discharge end of the blower should be pointed away from prevailing winds. 2

Page 2
Image 2