Blower connection at hood:
1.Run
2.Remove the cover from the wiring box and remove one knockout.
3.Feed 6” of cable through the knockout opening and secure the cable to the wiring box with an appropriate connector.
4.Make electrical connections at the hood. Connect
5.Replace the wiring box cover and screws.
make sure wires are not pinched between the cover and box.
Exterior blower connection:
1.Make electrical connections at the exterior blower (see instructions provided with the exterior blower).
Power connection at hood:
1.Plug the power cord into the electrical wall receptacle.
CONNECT DUCTWORK
1.Use mounting screws (4,8x38mm) and drywall anchors to secure flue mounting bracket to the ceiling and wall as shown.
2.Use 8" round metal duct to connect the discharge collar on the hood to the ductwork above.
3.Use duct tape to make all joints secure and air tight.
4.Connect the upper flue to the bracket with mounting screws (3,9x9,5mm).
5.Slide the lower flue downward, until it fits properly around hood.
6.Secure lower flue to hood with mounting screws (3,9x9,5mm).
FASTEN FLUE TO HOOD AND BRACKET
WITH MOUNTING SCREWS (3,9x9,5mm)
BLOWER CONNECTION AT HOOD
CONNECT:
BOX MARKED “MOTOR CONNECTION”
FLUE MOUNTING BRACKET
MOUNTING
SCREWS
(4,8x38mm)
DECORATIVE
FLUE
DUCT TAPE
8" ROUND
METAL DUCT
- 7 -