|
|
| MODELS QTR080L • QTRE080FLT • |
|
|
| QTR110L • QTRE110FLT |
|
|
|
|
|
|
|
|
|
|
| Page 3 |
INSTALL HOUSING & DUCT |
| CONNECT WIRING |
1. | Bend |
|
| housing |
|
| tabs. |
|
| Use a pliers to |
|
| bend housing |
|
| TABS out to 900. | TABS |
|
| |
2. | Mount | SPACER |
| housing to | (use for mounting to |
| joist. |
|
Hold housing in place so that the housing tabs contact the bottom of the joist.
The housing mounts with four
(4) screws or
nails. Screw or nail housing to joist through lowest holes in each mounting flange, then through highest holes. NOTE: Mounting to
3.Attach damper/duct
connector.
Snap damper / duct connector onto housing.
Make sure connector is flush with top of housing and damper flap falls closed.
4. Install
Connect
to damper / duct connector. Run
ductwork to a roof cap or wall cap. Tape all
ductwork connections to make them secure and air tight.
5. Connect electrical wiring.
Run 120 VAC house wiring to installation location. Use proper UL approved connector to secure house wiring to wiring plate. Connect wires as shown in wiring diagrams.
INSTALL GRILLE
6. Finish ceiling.
Install ceiling material. Cut out around housing.
7. Attach grille to housing.
Squeeze grille springs and insert them into slots on each side of housing.