Cisco Systems 7600 manual Patch Cord Installation, B-17

Models: 7600

1 70
Download 70 pages 32.94 Kb
Page 65
Image 65
Patch Cord Installation

Appendix B Cable and Connector Specifications

LX/LH GBIC and MMF Cable Considerations

Patch Cord Installation

Warning Invisible laser radiation may be emitted from disconnected fibers or connectors. Do not stare into beams or view directly with optical instruments. Statement 1051

Plug the end of the patch cord labeled “To Equipment” into the GBIC (see Figure B-9). Plug the end labeled “To Cable Plant” into the patch panel. The patch cord is 9.84 feet (3 meters) long and has duplex SC male connectors at each end.

Figure B-9 Patch Cord Installation

 

To equipment

To cable plant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13089

 

 

Cisco 7600 Series Router Supervisor Engine and Route Switch Processor Guide

 

 

 

 

 

 

 

OL-10100-04

 

 

B-17

 

 

 

 

 

Page 65
Image 65
Cisco Systems 7600 manual Patch Cord Installation, B-17