Bryant 698B instruction manual Xiv. Final Checks, Care And Maintenance

Models: 698B

1 16
Download 16 pages 12.64 Kb
Page 14
Image 14

XIV. FINAL CHECKS

IMPORTANT: Before leaving job, be sure to do the following:

1.Ensure that all wiring and tubing is secure in unit before adding panels and covers. Securely fasten all panels and covers.

TABLE 7—TWO-SPEED COMPRESSOR (WINDING RESISTANCE AT 70°F ± 20 °)

WINDING

2 TON

3 TON

4 TON

5 TON

Start (S-C)

2.280

1.850

1.459

0.740

Run (R-C)

0.770

0.745

0.552

0.356

2.Tighten service valve stem caps to 1/12-turn past finger tight.

3.Leave User’s Manual with owner. Explain system operation and periodic maintenance requirements outlined in manual.

4.Fill out Dealer Installation Checklist and place in customer file.

CARE AND MAINTENANCE

For continuing high performance and to minimize possible equip- ment failure, periodic maintenance must be performed on this equipment. Frequency of maintenance may vary depending upon geographic areas, such as coastal applications.

—14—

Page 14
Image 14
Bryant 698B instruction manual Xiv. Final Checks, Care And Maintenance