Figure 1 | Connection of Twinning Leads and Locating Isolation Relay On Furnace #1 Control Panel | ||
|
| CONTROL PANEL (Located In Blower Compartment). | |
| Z1 |
|
|
| T |
| Transformer |
| W |
|
|
| I |
|
|
| N |
|
|
|
| ST9120C40 | ELECTRONIC |
|
|
| |
Twinning Leads |
| FAN CONTROL | |
| ST9120 | ||
| 4 | ISOLATION RELAY |
|
|
| (SPST) |
|
| 2 | DRILL TWO 1/8” Dia. |
|
|
|
| |
| 1 | 3 |
|
|
| CONTROL PANEL (Located In Blower Compartment). | |
| ST9160B |
| Transformer |
|
|
| |
TWIN | H | DATA | ELECTRONIC |
| FAN CONTROL | ||
| ST9160 | ||
|
| ||
| C |
|
|
|
|
| Twinning Leads |
| 4 | ISOLATION RELAY |
|
|
| (SPST) |
|
| 2 | DRILL TWO 1/8” Dia. |
|
|
|
| |
| 1 | 3 |
|
|
|
| |
|
|
| 3 |