Bunn AFPO-2 SL, AFPO-3 Operating Controls, A. Main Power On/Off, B. Refill Circuit On/Off

Models: AFPO-3 SL AFPO-2 SL AFPO-3

1 8
Download 8 pages 54.73 Kb
Page 7
Image 7
OPERATING CONTROLS

OPERATING CONTROLS

 

 

 

 

 

 

C

 

 

 

 

 

 

B

 

 

 

 

 

1

A

 

 

 

 

 

 

 

 

 

 

REFILL

2

 

 

 

 

 

 

 

 

 

 

3

 

N

 

 

 

 

 

MAI

 

 

 

 

TER

 

 

 

 

 

 

WA

 

 

 

 

 

 

INPUT

 

 

 

 

1

 

 

 

 

 

 

 

1

 

 

 

 

VOR

VOR

 

 

 

 

 

FLA

2

 

 

 

 

FLA

INPUT

 

 

 

P1949

UTPUT

 

 

 

 

 

 

 

 

 

 

 

A. MAIN POWER ON/OFF

The main power ON/OFF switch is located on the right of the front panel just above the power cord.

B. REFILL CIRCUIT ON/OFF

The refill circuit ON/OFF switches are located on the right of the front panel just above the main power switch. These allow each circuit to operate independently.

C. TEST/OPERATE

The TEST/OPERATE switch is located inside the auto-fill box just below the top access cover. For setting flow rates and mix ratios for flavors, place the TEST/OPER- ATE switch in the “TEST” position. This allows the op- erator to run the water and flavor lines for each circuit depending on the requirements for the flavor recipe.

D. PROBE CONTROL BOX LOW/OFF/HIGH

On models equipped with a dual level probe, there is a LOW/OFF/HIGH switch located at the probe control box on the hopper. The “OFF” position allows the operator to disable the probe for that hopper only. THE “LOW” and “HIGH” positions allow the operator to select the level of product desired for that hopper.

D

P1951

7

28791

040501

 

Page 7
Image 7
Bunn AFPO-2 SL, AFPO-3 SL Operating Controls, A. Main Power On/Off, B. Refill Circuit On/Off, C. Test/Operate