Bunn dispenser service manual Initial Set-Up, User Notices

Models: dispenser

1 34
Download 34 pages 17.06 Kb
Page 3
Image 3
INITIAL SET-UP

INITIAL SET-UP

1.Loosen auger motor cover screws.

2.Remove rear plastic plug from trim strip between hopper drip trays.

3.Install support rod into hole in trim strip.

4.Place PAF platform assembly on top of motor covers.

5.Tighten support rod from top of platform.

6.Retighten motor cover screws.

7.Plug RCA cord into ULTRA base unit.

8.Install hopper seal and press firmly into place on the flange of the cooling drum.

9.Align the auger shaft with the flat fin of the auger. Push the augers as far as they will go and rotate them so the flat fin is facing up.

10.Place level probes in notch in rim of hoppers and install hoppers.

10.Install PAF units onto hoppers and platform.

11.Plug PAF power cord into rear of platform.

12.Plug PAF platform power cord into proper electrical outlet.

13.Attach a flexible water line to the .25" flare fitting on the back panel of the Powder Auto-Fill.

NOTE: A water strainer assembly (BUNN-O-MATIC #23820.1000) should be installed in line prior to the flexible water line.

USER NOTICES

Carefully read and follow all notices on the equipment and in this manual. They were written for your protection. All notices are to be kept in good condition. Replace any unreadable or damaged labels.

00656.0000

Push back until fully latched before removing or manually filling chilled product hopper.

00986.0000

34561.0000

3

29793.1 080102

 

Page 3
Image 3
Bunn dispenser service manual Initial Set-Up, User Notices