Bunn ULTRA-2 PAFA manual Assembly

Models: ULTRA-2 PAF ULTRA-2 PAFA

1 4
Download 4 pages 4.46 Kb
Page 3
Image 3
ASSEMBLY

ASSEMBLY

1.Replace the auger nose bush- ing inside the front of the hopper.

5.Position the faucet seal and the return spring in the faucet valve.

9.Turn ON augers and cooling function to desired settings.

2.Install the hopper seal over the flange at the rear of the cooling drum as shown.

6.Slide the faucet valve assem- bly into place on the hopper.

NOTE: Whether liquid concen- trate or granulated powder, all product must be thoroughly mixed BEFORE adding it to the hoppers.

3.Align the auger shafts with the augers. Push the augers as far as they will go and rotate them so the flat face of the auger shaft is aligned with the flat face of the auger nose.

7.Press down on the valve to compress the spring. Position the faucet handle over the faucet valve one side at a time and snap into place on the hopper.

10. Slide PAF assembly forward.

4.Install the hopper over the auger and cooling drum and slide it into place. Push down until the hopper lock plunger snaps into place.

8. Install the drip tray and cover.

11.Reassemble and install all PAF parts. Return power switch to the ON position. Close Door.

3

43553 071410

 

Page 3
Image 3
Bunn ULTRA-2 PAFA manual Assembly