SERVICE
This section provides procedures for testing and replacing various major components used in this brewer should service become necessary. Refer to Troubleshooting for assistance in determining the cause of any problem.
WARNING - Inspection, testing, and repair of electri- cal equipment should be performed only by qualified service personnel. The brewer should be unplugged when servicing, except when electrical tests are re- quired and the test procedure specifically states to plug
in the brewer.
COMPONENT ACCESS
WARNING - Disconnect the brewer from the power source before the removal of any panel or the replace- ment of any component.
All components are accessible by the removal of the top cover and front inspection panel and warmer assemblies.
The top cover is attached with one
The front inspection panel is attached with four #6- 32 screws.
The warmer assembly is attached with three
| Contents |
Control Thermostat | ............................................ 10 |
Limit Thermostat | 11 |
ON/OFF Switch | 12 |
Tank Heater | 13 |
Tank Heater Switch | ............................................ 14 |
Warmer Elements | 16 |
Wiring Diagrams | 17 |
P1160.40 |
FIG. 1 COMPONENT ACCESS |
Page 9 | 10860 | 090800 |
|
|