TABLE 4.2: CLEARANCES FROM VENT PIPING TO COMBUSTIBLE CONSTRUCTION

TYPE OF VENT PIPE

PIPE DIRECTION

ENCLOSURE

MINIMUM CLEARANCE

TO COMBUSTIBLE

 

 

 

MATERIAL

60/100mm

VERTICAL OR

ENCLOSED ON ALL FOUR

 

CONCENTRIC VENT-

0”

HORIZONTAL

SIDES

ING

 

 

 

 

HEAT FAB SAF-T VENT

 

AT LEAST ONE SIDE OPEN,

 

PROTECH FASNSEAL

VERTICAL OR

1”

COMBUSTIBLE MATERIAL ON

Z-FLEX Z-VENT III

HORIZONTAL

 

A MAXIMUM OF THREE SIDES

 

FLEX-L STAR-34

 

 

 

 

 

 

 

 

 

HEAT FAB SAF-T VENT

 

 

 

PROTECH FASNSEAL

HORIZONTAL OR VERTI-

ENCLOSED ON ALL FOUR

2-1/2”

Z-FLEX Z-VENT III

CAL WITH OFFSETS

SIDES

 

FLEX-L STAR-34

 

 

 

 

 

 

 

HEAT FAB SAF-T VENT

 

 

 

PROTECH FASNSEAL

VERTICAL WITH NO OFF-

ENCLOSED ON ALL FOUR

2-1/2”

Z-FLEX Z-VENT III

SETS

SIDES

 

FLEX-L STAR-34

 

 

 

6