Bush Hog 2545 manual OPS-L-0007C

Models: 2545

1 100
Download 100 pages 10.16 Kb
Page 58
Image 58

OPERATION

OPERATION

LOADER BOOM ASSEMBLY

Inspect condition of each arm section weldment

Ensure all pins are in place.

Ensure all bolts and screws are properly installed.

Check condition of bushings at boom pivot points.

Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly. OPS-L-0005_C

HYDRAULIC LINE INSPECTION

Check for hydraulic leaks along hoses, cylinders and fittings. IMPORTANT: DO NOT use your hands to check for oil leaks. Use a piece of heavy paper or cardboard to check for hydraulic oil leaks.

Inspect the condition of the valve weldment.

Ensure fitting is properly connected

Inspect condition of bushings.

OPS-L-0006_B

BUCKET INSPECTION

Ensure all pins are in place.

Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly.

Inspect the condition of the bucket lug weldments.

Inspect condition of bushings.

OPS-L-0007_C

Hydraulic Hoses

Bucket Pins

2545 01/11

Operation Section 4-14

© 2011 Alamo Group Inc.

Page 58
Image 58
Bush Hog 2545 manual OPS-L-0007C