Bush Hog 2545 manual Peeling and Scraping

Models: 2545

1 100
Download 100 pages 10.16 Kb
Page 74
Image 74

OPERATION

OPERATION

It is important to keep the bucket level when approaching a bank or pile. This will help prevent gouging the work area.

PEELING AND SCRAPING

Use a slight bucket angle, travel forward and hold lift control forward to start the cut. Make a short 5 to 8 foot angle cut and break out cleanly.

With bucket level, start a cut at notch approximately 2 inches deep. Hold depth by feathering bucket control to adjust cutting lip up or down. When front tires enter the notch, adjust lift cylinder to maintain proper depth.

2545 01/11

Operation Section 4-30

© 2011 Alamo Group Inc.

Page 74
Image 74
Bush Hog 2545 manual Peeling and Scraping