(SBM-6)

OPERATION

OPERATION

FRAME ASSEMBLY

Inspect condition of mounting frame weldment.

Inspect condition of King Post frame.

Ensure all bolts and screws are in position and are properly torqued.

Ensure all pins are in place and fastened with screws.

Ensure frame is properly mounted to tractor and hardware is propely installed and tightened. OPS-B- 0021_F

Relieve hydraulic pressure prior to doing any maintenance or repair work on the Implement. Place the Mower Head on the ground or securely supported on blocks or stands, disengage the PTO, and turn off the engine. Push and pull the control Levers or Joystick several times to relieve pressure prior to starting any maintenance or repair work.

Never Leave the mower unattended while the head is in the raised position. The mower could fall causing serious injury to anyone who might inadvertently be under the mower (SBM-4)

BOOM ARM ASSEMBLY

Inspect condition of each arm section weldment

Ensure all pins are in place.

Ensure all bolts and screws are properly installed.

Check condition of bushings at boom pivot points.

Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly. OPS-B- 0022_H

PT5 09/10

Operation Section 4-14

© 2010 Alamo Group Inc.

Page 46
Image 46
Bush Hog PT5 manual Frame Assembly