INSTALLATION INSTRUCTIONS

INSTALLATION AND OPERATIONAL CHECKS

After installation, check for gas soundness. The supply pressure can be checked at the front left hotplate burner.

Fit the battery. Fit the hotplate burner bodies and caps and pan supports. Referring to the instructions for use where necessary,

1.Check that the hotplate and grill burners ignite correctly and burn with a steady flame. Check for a steady flame on the low setting.

2.Check that with the oven set to mark 9, the burner ignites at low rate, and then increases to full rate within 60 seconds. Leave the oven full on with the door closed for 10 minutes, and check that when the control is turned to the ‘Slow Cook’ setting that the flame reduces.

Instruct the user on the operation of the cooker.

NOTE: On the models manufactured for use with LPG, it is normal for the oven and grill burners to burn with yellow tips.

23

Page 23
Image 23
Cannon 10905G, 10935G, 10938G, 10900G, 10908G, 10932G, 10930G Installation Instructions, Installation and Operational Checks