LEGEND
TXV — Thermostatic Expansion Valve
Factory Piping
Field Piping
NOTE: The bypass valve in this package has 5/8 in. connections and can be used directly on 30GT015- 035 units.
Fig. 1 — 30GT Piping Schematic
DISCHARGE STUB (HIDDEN)
LIQUID
STUB
Fig. 2 — 30GT Stub Locations
Install the
Step 2 — Dehydrate and Recharge the Cir- cuit — When piping is completed, leak test the assembly and replace the filter drier cores. Then evacuate, dehydrate, and re- charge the circuit, using approved refrigeration practices.
Step 3 — Install Control Wiring
Be sure all power to the unit is off before proceeding, and that all disconnects are open and tagged.
Follow all local codes and NEC (National Electrical Code, U.S.A.) when installing control wiring. All wire must be a min- imum of 16 AWG (American Wire Gage, U.S.A.).
Connect control wires as shown in Fig. 3. At hot gas sole- noid (HGS), connect to brown and orange wires as shown.
| LEGEND |
|
|
COM — Common | NC — Normally Closed | TC — | Temperature Controller |
HGS — Hot Gas Solenoid | NO — Normally Open | U1 — | Unloader 1 |
Fig. 3 — 30GT Hot Gas Solenoid Wiring