INSTALLATION STEP 3
Attach the T-Rail to the Header
Bracket
| • | Position the opener on the garage floor below the |
Header Wall |
| header bracket. Use packing material as a |
| protective base. NOTE: If the door spring is in the | |
|
| |
Header |
| way you’ll need help. Have someone hold the |
Bracket |
| opener securely on a temporary support to allow |
|
| |
Chain |
| the rail to clear the spring. |
|
| |
Pulley | • | Position the rail bracket against the header |
Bracket |
| bracket. |
|
| |
| • | Align the bracket holes and join with a clevis pin |
|
| as shown. |
| • | Insert a ring fastener to secure. |
Ring Fastener | ||
Header Bracket | ||
|
Clevis Pin
Chain
Pulley
Bracket
Garage
Door
DOWNINCREASE
TRAVEL
UP
Temporary
Support
HARDWARE SHOWN ACTUAL SIZE
Clevis Pin |
|
Ring Fastener |
11