Installation 11
Installation
Step 1: Mounting1Layout the concrete pad as detailed in Figure 4. Be sure to locate electrical conduit inside the hatched 14" x 13" area.
2Excavate required area for pad and conduit. Pad depth should be below the frost line, or as required by local codes.
3Locate four 1/2" X 6" long
4Pour concrete, insuring that the pad is level and above the ground line.
5 Allow the concrete to set at least two days before installing gate.
Figure 4: Concrete Pad LayoutDoc