Charnwood LA30iB Assembly, Pre Lighting Check, Commissioning, Freestanding Kit

Models: LA30iB

1 14
Download 14 pages 21.17 Kb
Page 12
Image 12
ASSEMBLY

ASSEMBLY

Fit the side panels, hood and top grid onto the appliance. Instructions for this are enclosed with the panel pack.

Replace any internal parts previously removed.

PRE LIGHTING

CHECK

Before initial lighting check the following points:

1.The bottom grate bars must all be fitted and should move freely and easily when the riddling mechanism is operated.

2.The plates round the sides and

 

Flaunching

 

Take Flue Pipe

 

Up To Narrowest

 

Part Of Chimney.

 

150° Elbow

 

Part No. 010/AV12

 

Vermiculite

150°

Infill

Fig. 10. Typical Installation

back of the grate must be in position and sitting correctly.

3.The throat plate must be fitted in the roof of the appliance.

COMMISSIONING

On completion of the installation and after allowing a suitable period of time for the fire cement and mortar to dry out, the fire should be lit and checked to ensure that smoke and fumes are taken from the appliance up the chimney and emitted safely. Also check all joints and seals.

The central heating pump should be adjusted to give the correct water flow against the circuit resistance and the system should be correctly balanced.

On completion of the installation and commissioning please leave the operating instructions with the customer and advise on the use of the fire and any controls on the system.

FREESTANDING KIT

A freestanding kit is available. Details of dimensions and outputs are available on request.

18mm

LockingNut

Thermostat Flap

Fig. 11. Thermostat Setting

Page 10

LA30iB 3.99

Page 12
Image 12
Charnwood LA30iB Assembly, Pre Lighting Check, Commissioning, Freestanding Kit, Thermostat Setting, Typical Installation