Installation Instructions | MCD Series |
INSTALLATION
WARNING: FAILURE TO PROVIDE ADEQUATE STRUCTURAL STRENGTH FOR THIS COMPONENT CAN RESULT IN SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT! It is the installer’s responsibility to make sure the structure to which this component is attached can support five times the combined weight of all equipment. Reinforce the structure as required before installing the component.
IMPORTANT ! : These installation instructions assume that a
Attaching Mount to NPT Pipe
CAUTION: Watch for pinch points. Do not place fingers between moveable parts.
1.Thread the MCD mount (A) onto the existing
2.Install and tighten the
NPT |
|
|
Pipe |
|
|
(A) |
|
|
1 | 2 | (B) x 1 |
Figure 1
Attaching Interface Bracket to Displays
1.Attach MSBU or MSBV interface bracket to displays following instructions included with MSBU/MSBV interface bracket kit.
Attaching Displays to Mount
1.While supporting both sides of display, align four mounting buttons on interface bracket with four mounting holes in mount. (See Figures 2, 3 and 4)
1 |
2 |
(A) |
Display |
Figure 2
WARNING: DISPLAY MAY WEIGH IN EXCESS OF 40 LBS! Always use two people and proper lifting techniques when installing or positioning display on mount.
2.Lower display into place listening for audible "click" to ensure recessed area of mounting buttons are properly seated in lower area of mounting holes and ClickConnect mechanism has engaged. (See Fig. 2, 3 and 4)
3.Repeat Steps 1 and 2 for second display.
| MSBV interface |
| bracket |
Back | (example only) |
of Display |
|
(A) |
|
Figure 3
5