Manuals
/
Brands
/
Computer Equipment
/
Server
/
Cisco Systems
/
Computer Equipment
/
Server
Cisco Systems
SFS 3001
- page 28
1
28
30
30
Download
30 pages, 1.19 Mb
20
15.
Return to User Exec mode or Privileged Exec mode and enter the show fc srp itl command to verify
that the ITL is active. Port numbe
rs appear in the physical-access a
nd active-ports fields to indicate
that the ITL is active.
Contents
Main
Page
Contents Regulatory Notices.......................................... v
1: Topspin 90 Quick Start............................... 1
Page
v
Regulatory Notices
FCC Statement
Safety Information
Electrical Cautions
vi
vii
General Cautions
Laser Cautions
viii
Contact Information
Laser Specs
Topspin 90 Quick Start
Prepare the Site
Install the Topspin 90 in an Equipment Rack
Requirements
Prepare for the Installation
Rack Mount Installation
Page
Page
Install Expansion Modules (Optional)
Cable the Switch
Connect Management Ports
Connect InfiniBand Cables
(Optional) Connect to Ethernet Devices
Configure Basic Connectivity
Assigning an Address Statically
Assigning an Address Dynamically (DHCP)
Connect and Configure InfiniBand Hosts
Page
Install the Element Manager (GUI)
Launch Chassis Manager
Configure Additional Settings
(Optional) Configure the Ethernet Gateway
Layer 2 Bridging Procedure
Page
Configure the Fibre Channel Gateway (Optional)