Step

12

ÖInstall the Side Burner Valve.

ÖNOTE: On some models, the M4 x 10mm Screws (WQ) are pre-installed on the bracket by the factory.

Hardware shown actual size

(WQ)

M4 X 10mm Screw

(2) Qty.

12-A

12-A. Route the Side Burner Valve through the Large Hole in the Left Panel.

12-C

WQ (x2)

Side

Burner

Valve

View From Back of Grill

12-C. Attach the Side Burner Valve with two Screws (WQ).

12-B

Side

Burner

Valve

Large Hole

12-D

View

from

Above

12-E

View

from

Below

21

Page 21
Image 21
Coleman 5400 LP manual 12-A, 12-C, 12-B, 12-D, 12-E