This section covers the settings required for PPP (point-to-point) protocol operation of the WAN interfaces.

Internal T1 CSU/DSU (WAN 0) Link Configuration

Required for Dedicated Line Operation

This is the only mode of operation supported via the built-in T1 CSU/DSU.

Set PPP connection

CV: Use the Link Configuration: WAN 0 Dialog Box.

TB: Use configure and set the Mode keyword in the Link Config WAN 0 section.

Suggested for Dedicated/Leased Line Operation

Dedicated line operation generally does not require additional parame- ters for operation.

RS-232 (WAN 1) Link Configuration

Required for Dedicated/Leased Line Operation

Dedicated line operation is the simplest to set up.

Set Dedicated connection

Set PPP connection

CV: Use the Link Configuration: WAN 1 Dialog Box.

TB: Use configure and set the Mode and ConnectMode keywords in the Link Config WAN 1 section.

Suggested for Dedicated/Leased Line Operation

Dedicated line operation generally does not require additional parame- ters for operation.

Required for Dial-On-Demand Operation

This mode of operation is only supported on the WAN 1 RS-232 inter- face. Incoming dial-on-demand operation requires only slightly more information than dedicated line setup. Outgoing dial-on-demand requires additional information (see the suggested settings below).

Set dial-up connection