FCB Ice Probe Supplemental Harness Installation Instructions

INSTALLATION INSTRUCTIONS

ICE PROBE SUPPLEMENTAL HARNESS

The following instructions should be used for installation of the Ice Probe Supplemental Harness on Pin- nacle FCB units. Each kit will upgrade the harness for 1 main board (2 barrels).

Parts List

Item

Description

Qty

Number

 

 

 

 

 

1

Harness for Connector J7

1

 

 

 

2

Harness for Connector J18

1

 

 

 

Tools Required

Flat Screwdriver ¼” Nut Driver

CAUTION – Only trained and certified electrical technicians should service this unit. ALL WIRING MUST CONFORM TO NATIONAL AND LOCAL CODES.

CAUTION – This installation will be around electrical components in the control box. Use caution to avoid electrical shock.

WARNING – HIGH VOLTAGE is present on the Inverter Board for 5 minutes after the unit is unplugged. Working on the unit before the 5 minutes has passed may result in electrical shock or death.

Installation Steps

1.Switch the power to the unit off or remove the fuse to the electrical power circuit breaker.

2.Lift the merchandiser to gain access to the control box front. Remove the screws that hold the con- trol box door closed to gain access to the Main Control Board.

Main Board

Connection

J18

Main Board

Connection

J7

Main Control Board

3.Disconnect the connector J7 from the Main Control Board.

4.Using the provided White/Orange harness, connect the Male end to the Main Control Board at J7 and the Female end to the Male end of the main unit harness J7.

Main Board

Connection

J7

Main Unit Harness J7

Release Date: November 11, 2003

www.cornelius.com

Revision: A

© 2003, IMI Cornelius Inc.

- 1 -

Publication Number: 629088376INS

Page 1
Image 1
Cornelius J7, J18 installation instructions Installation Instructions, Parts List, Tools Required, Installation Steps