Cornelius J7 installation instructions Main Board Connection J18 Main Unit Harness J18

Models: J18

1 2
Download 2 pages 1.14 Kb
Page 2
Image 2
Main Board

FCB Ice Probe Supplemental Harness Installation Instructions

5.Disconnect the connector J18 from the Main Control Board.

6.Using the provided White/Blue Harness, connect the Male end to the Main Control board at J18 and the Female end to the Male end of the main unit harness J18.

Main Board

Connection

J18

Main Unit Manual background Harness J18

7.Replace the screws that hold the control box door closed.

8.Switch the power to the unit on. After the unit runs through the initialization, turn both barrels on. Verify that the unit starts to refrigerate the barrels by drawing enough product to cycle the blendona- tor.

Publication Number: 629088376INS

- 2 -

© 2003, IMI Cornelius Inc.

Page 2
Image 2
Cornelius J7 installation instructions Main Board Connection J18 Main Unit Harness J18