Step Two

A

B

B

Ice Bank Control

P/N 33-5794-000

P/N 3529

C

Red Lead

Black Lead

P/N 3576

P/N 3575

A.Snap the new ice bank control bulb holder (P/N 3529) onto the second and third coil from the top.

B.Place the ice bank control bulb into the holder and secure it with two poly ties

(P/N 040056-000). Replace the basket and hook up the tubes to the valves.

C.Connect the red and black wire leads to the ice bank control as shown.

P/N 185211007

2

8/25/94

Page 2
Image 2
Cornelius P/N 3626 manual Step Two, Ice Bank Control Red Lead Black Lead