Step Four

SReconnect all product tubing. Be sure the tapered white nylon washers are in place.

SRoute the tubing through the back hole of the panel and tie in place.

SApply the DANGER decal to the top of the control box.

SSnap the grommet and the snap bushing into the holes of the control box as shown.

SPlace the ice bank control in the control box with the capillary tube going through the grommet. Screw the ice bank control in place.

SRoute the agitator motor electrical leads and the electrical cord through the snap bushing.

SConnect all wiring as shown.

SWhen connecting ground leads, be sure to attach power cord ground lead first then apply a nut and tighten. Then apply the ground lead from the agita- tor motor and then the final nut. Tighten securely

Capillary Tube

 

 

Agitator Motor Wire

Grommet

(smooth)

 

Green Ground wire

Agitator Motor

Red

Jumper Wire

Black

Snap Bushing

Jumper Wire

 

Agitator Motor

Wire (Ribbed)

Red Wire

Black Wire

White Wire

Green Ground Wire

Gray Power Cord

 

 

Gray Power Cord

Gray Power Cord Power Cord (Secure

 

 

 

first to Control box

P/N 185211007

4

8/25/94

Page 4
Image 4
Cornelius P/N 3626 manual Step Four