Craftsman 127.28875 manual Pre-Operation Check List, Operator’S Responsibility

Models: 127.28875

1 37
Download 37 pages 32.36 Kb
Page 20
Image 20
PRE-OPERATION CHECK LIST

PRE-OPERATION CHECK LIST

PRE-OPERATION CHECK LIST

 

 

 

 

(OPERATOR’S RESPONSIBILITY)

 

 

___

Review and follow all safety rules and safety

___

Never allow riders.

 

decal instructions.

___

Inspect area and remove stones, branches or

___

Check that all safety decals are installed and in

 

other hard objects that might be thrown,

 

good condition. Replace if damaged.

 

causing injury or damage.

___

Check to make sure all shields and guards

___

Clean area around oil fill dipstick. Remove

 

are properly installed and in good condition.

 

dipstick and check to be sure oil is in operating

 

Be sure that either the discharge shield or

 

range (between marks on dipstick). Add oil if

 

complete vacuum attachment is installed.

 

necessary but Do Not Overfill. Install dipstick

___

Check that all hardware is properly installed.

 

assembly firmly until cap bottoms out on tube.

 

and secured.

 

Dipstick assembly must always be secured into

___

Check that equipment is properly and securely

 

fill tube when engine is running.

 

attached to power unit.

___

Check all lubrication points and grease as

___

Check to be sure engine is free of dirt and

 

instructed in manual.

 

debris. Pay particular attention to the cooling

___

Check hydrostatic fluid level. Check to be sure

 

fins, governor parts and muffler. Clean air

 

cooling fins on hydrostat are clean.

 

intake screen. Check air cleaner; service if

___

Perform a functional check of the safety

 

necessary.

 

interlock system each time you operate the

 

 

 

unit.

 

 

 

 

 

 

 

 

18

Page 20
Image 20
Craftsman 127.28875 manual Pre-Operation Check List, Operator’S Responsibility