=/CHECKLIST
Before you operate and enjoy your new tractor, we wish to assure that you receive the best performance and satisfaction from this quality product.
Please review the following checklist: ,/ All assembly instructions have boon
completed.
,/No remaining loose parts in carton. ,/'Battery is propedy prepared and
cberged.(Minimum 1 hour at 6 amps). 4" Seat is adjusted comfortably and
tightened securely.
4" All tires are propedy inflated. (For shipping purposes, the tires were ovednflated at the factory).
/' Be sure mower deck is propedy leveled
4Check mower and drive belts. Be sure
they are routed propedy around pulleys and inside all belt keepers.
•/ Check widng. See that all connections are still secure and wires are properly clamped.
While learning how to use your tractor, pay extra attention to the following important items:
JEngine oil is at proper level.
4Fuel tank is filled with fresh, clean,
regular unleaded gasoline.
,/Become familiar with all controls - their
location and function. Operate them before you start the engine.
4Be sure brake system is in safe operating condition.
12