Manuals
/
Brands
/
Household Appliance
/
Boiler
/
Crown Boiler
/
Household Appliance
/
Boiler
Crown Boiler
32
- page 15
1
15
71
71
Download
71 pages, 3.98 Mb
15
13
Figure 6:
Assembly Of Sections
Figure 5:
Use Of Nipple Gauge
Contents
Main
D E S I G N E D T O L E A D
Series 32
Gas-Fired Natural Draft Steam or Water Boilers INSTALLATION AND OPERATING INSTRUCTIONS
These instructions must be affixed on or adjacent to the boiler.
Page
Table of Contents
I Product Description
Page
Table 1A: Dimensional Data
1. All Dimensions Are Approximate.
Table 1B: Specifications
Page
Page
III Before Installing
IV Locating the Boiler
Table 2: Minimum Room Volumes Based On Sixteen Times Boiler Volume By Model Size
Figure 3: Clearances To Combustible Construction
Table 3: Minimum Clearances to Combustibles
V Knockdown Boiler Assembly Instructions
B. Base Assembly
Page
C. Section Assembly
Page
Page
Page
Page
D. Jacket Assembly Instructions
Figure 13: Jacket Mounting Bracket Arrangement
Page
VI Air For Combustion and Ventilation
Warning
Figure 15: Boiler Installed In Confined Space, All Air From Inside
Page
Page
VII Venting
Table 4: Sizing For Vent Systems Outside The Scope Of The National Fuel Gas Code Venting Tables
Page
Removing An Existing Boiler From A Common Chimney
VIII Steam Boiler Piping & Trim Installation
A. Heating System Piping (Steam Boilers)
DANGER
Table 5
Figure 22: Steam Boiler Tapping Locations
Tapping Uses Chart For Steam Boilers
Page
Figure 25: Common Near-Boiler Piping Mistakes
Table 6: Steam Boiler Riser & Header Pipe Sizes
Page
Page
Page
Page
B. Indirect Water Heating Piping (Steam Boilers)
IX Water Boiler Piping
A. Heating System Piping
DANGER
Tapping Uses Chart For Water Boilers
Figure 29: Water Boiler Tapping Locations
Table 7
Page
Table 8: Water Boiler Supply & Return Pipe Sizes
Figure 31: Recommended Boiler Piping For Combination Heating & Cooling Systems
B. TANKLESS HEATER PIPING
43
Table 9: Tankless Heater Specifications
Figure 32: Tankless Heater Piping
X Gas Piping
XI Control System Wiring
Sequence of Operation CSD-1 Boiler Wiring
Figure 34: Typical Wire Routing
Page
Page
Safety Control Operation
XII Start-up and Checkout
Figure 37: Pilot Burner Flame Figure 38: Main Burner Flame
Page
Page
OPERATING INSTRUCTIONS
TO TURN OFF GAS TO APPLIANCE
FOR YOUR SAFETY READ BEFORE LIGHTING
LIGHTING INSTRUCTIONS FOR BASE MODULES EQUIPPED WITH HONEYWELL VR8304 SERIES GAS VALVES
OPERATING INSTRUCTIONS
TO TURN OFF GAS TO APPLIANCE
FOR YOUR SAFETY READ BEFORE LIGHTING
GAS INLET GAS CONTROL KNOB SHOW N IN "OFF" P OSITION
POSITION INDICATOR
XIII Service and Maintenance
Page
XIV PARTS
SERIES 32 MASTER PARTS LIST
BASE CARTON
MODEL T-1 T-2 T-3 310022
TANKLESS CO ILS PARTS
PART # 310020 310021
INTERMEDIATE CARTON
SECTION JOINER CARTON
BASE SIDE CARTON
JACKET SIDE P ANEL CARTON
BASE PARTS
Page
BASE PARTS (CONTD.)
Page
WATER TRIM CARTON
STEAM TRIM CARTON
WATER BOILER CARTON
STEAM BOILER CARTON