Vertical Installation with Keyhole Mounts (0U Models)

Step 1 – Keyhole Mount installation

Attach the Keyhole Mounting Pegs to the PDU with the 2 supplied Bracket Mounting Screws (M4 X 8).

Step 2 – PDU Mounting

Align the the Keyhole Mounts to the Keyhole Slots on the rack. Insert and slide down to lock firmly into place.

Cord Retention Tray installation

(Optional for both horizontal and vertical installations)

Attach the Cord Retention Tray to the PDU with the 4 supplied Cord Retention Tray Mounting Screws (M3 X 6).

Attach the Cord Retainer Clips to the Cord Retention Tray.

Meter Configuration

!Depending on installation method (vertical or horizontal), Note the LED Meter may need to be rotated, before installation,for proper orientation.

Use a screwdriver to gently remove the LED Meter. Rotate the LED Meter 90 degrees, and insert back into the PDU.

5

For information on Cyberpower products, visit www.CPSww.com

Electrical Installation

Step 1 – Receptacle evaluation

Ensure that the plug type of your PDU unit (e.g. NEMA 5-15P, NEMA 5- 20P, NEMA L5-30P) matches the wall receptacle type that you are using.

PDU must be plugged into a three-wire, grounded wall receptacle only. CAUTION!! The wall receptacle must also be connected to an appropriate branch

circuit/main with fuse or circuit breaker protection. Connection to any other type of wall receptacle may result in a shock hazard.

Step 2 – Plug the PDU into the wall receptacle

Step 3 – Attach equipment

Before attaching equipment, it is important to calculate the total load that you will be placing on the PDU. It is extremely important not to exceed the PDU's maximum current load (as outlined in the Specifications section). In order to determine your total load, simply add up the amperage of your devices and ensure that it does not exceed the unit’s capacity.

Troubleshooting

 

 

 

 

 

Problem

 

Possible Cause

Solution

PDU Outlets do not

1.

Open breaker

Reset Breaker check if

provide power to

2.

Loose power cord

plug is completely

connected

 

 

connected.

equipment

 

 

If the problem remains

 

 

 

contact tech support.

Amperage displayed

1.

Overload

The meter will flash

on Amperage Meter

2.

Amperage meter is

when overloaded.

exceeds the unit’s

 

damaged

Reduce the load on the

capability (Metered

 

 

PDU until the overload

type only)

 

 

is gone.

 

 

 

If the problem remains

 

 

 

contact tech support.

Circuit breaker has

1.

Sustained overload

Reset Breaker.

tripped

2.

Excessive ambient or

If the problem remains

 

3.

internal temperatures.

contact tech support.

 

Faulty breaker

 

For information on Cyberpower products, visit www.CPSww.com

6

Page 5
Image 5
CyberPower K01-0000083-00 Troubleshooting, Vertical Installation with Keyhole Mounts 0U Models, Meter Configuration