PowerPanel® Business Edition
Copyright © 2006-2007 Cyber Power Systems, Inc. All rights reserved. 18
overloaded
Battery-test failure The battery-test failed to provide battery power normally.
Batteries are not
present Batteries are not present; the Battery Backup cannot
provide battery power in this condition.
Batteries need to be
replaced Batteries may not work well any more; they need to be
replaced with new ones.
Communication lost Communication with device has been lost.
Communication
cannot establish Communication cannot establish during startup.
Information
Remaining runtime
is insufficient This event will occur when the battery is fully charged
and the remaining runtime is still less than sum of times
set in the following categories:
Event Utility power failure and Low Battery
shutdown action delay time.
Event Shutdown is initiated command file
execution time.
OS shutdown time.
All connected Slave OS shutdown time.
Plus an additional 30 seconds.
You need to unload some equipment connected to
the Battery Backup to get more remaining runtime.
Please make sure all connected equipment will have
enough remaining runtime when power problem
occurs.
Shutdown initiated Shutdown process initiated.
A schedule has
initiated A schedule has initiated, the system could be shutdown.
This event occurs when any one of following things
happens:
The schedule setup controlled outlet to Whole
outlet.
The Battery Backup support standalone outlet
control and the schedule setup controlled outlet to
Outlet#1 or Outlet2 and enable Shutdown OS.
Enters bypass mode
Enters bypass mode for power supply, battery power will
no longer be provided.