Installation Instructions
Verifying Proper Operation
Prior to operating the cooktop or oven, please read the accompanying use and care manual completely. It contains important safety, service and warranty information.
1.Before beginning the test procedure, ensure that all cooktop control valves are in the “OFF” position, and all burner rings, burner caps, and grates are properly positioned on the cooktop frame. Turn on the gas supply at the
2.Plug in the appliance cord, if applicable. Turn on power to the range at the circuit breaker or fuse box.
3.Set the time of day:
-Press the clock key.
-Enter the time on the number keypad (within 6 seconds).
-Press START.
4.Press the BAKE key.
5.Enter the temperature of 350°F on the keypad.
6.Press START.
7.The display should show BAKE, and the preheating temperature.
8.Press the
9.Test each cooktop burner separately by pushing in and turning one control knob at a time counterclockwise to the “HIGH” position. It may take up to four seconds for ignition to occur, at which time the ignitor will stop sparking. If ignition does not occur within four seconds, turn off the knob, wait for at least five minutes to allow any gas to dissipate, then repeat the ignition test. After ignition, rotate the control knob counterclockwise from “HIGH” to “LOW” to adjust the flame height progressively.
10.Turn the control knob to the “OFF” position.
11.Repeat the ignition test for all burners. When installed properly, the flame will be steady and
quiet. It will also have a sharp, blue inner cone
that will vary in length proportional to the burner OFF Icon size. If the range is equipped for use with LP
gas, the ends of the flame may be yellow at the tips, which is normal.
NOTES: If either the oven or cooktop does not operate properly, follow these troubleshooting steps:
1.Verify that power and gas are supplied to the range.
2.Check the electrical connections and gas supply to ensure that the installation has been completed correctly.
3.Repeat the above bake test or burner ignition test.
4.If the appliance still does not work, contact the Dacor Customer Service Team at (800)
Do not attempt to repair the appliance yourself. Dacor is not responsible for service required to correct a faulty installation.
Installation Checklist
WARNING
•To ensure a safe and proper installation, the following checklist should be completed by the installer to ensure that no part of the installation has been overlooked.
•Proper installation is the responsibility of the homeowner. The importance of proper installation of your Dacor range cannot be overemphasized.
□Has the plastic coating been peeled off of the outside of the range? Have all packaging materials been removed from inside the oven?
□Are all leveling legs extended down to make contact with the floor? Is the unit level? See Page 9.
□Is the range secured in place with the provided
□If the wall in back of the cooktop is combustible, is a backguard or raised vent installed?
□Is the range wired and grounded according to these instructions and in accordance with all applicable electrical codes? Has the electrical access cover been replaced? See Pages 3 and 12 to 17.
□Has the gas supply inlet pressure been measured to ensure that it does not exceed the maximums stated in these instructions? See page 4.
□Is the range connected to the gas supply according to these instructions and in accordance with all applicable codes? See page 17.
□Did the installer check the gas supply for leaks?
□Is the oven door properly installed according to these instructions? See page 18.
□Have the burner knobs been installed in the proper positions? See page 18.
□Are the burners and grates properly installed according to these instructions? See page 19.
□Has proper operation been verified?
□Have any problems been noted on the warranty card or during the
20