Dayton 3VG79B Dayton Portable Forced Air Heater, Maintenance Continued, Nozzle Assembly

Models: 3VG79B

1 16
Download 16 pages 9.88 Kb
Page 8
Image 8
NOZZLE ASSEMBLY

Dayton Operating Instructions and Parts Manual

3VG79B

Dayton® Portable

Forced Air Heater

Maintenance (Continued)

Ignitor Screw

 

 

Washer

 

Ignitor

Ignitor

 

 

Photocell

Element

Nozzle

 

Bracket

 

Adapter

 

 

Bracket

Combustion Chamber Nozzle

Nozzle

Adapter

Bracket

Photocell Bracket PUMP ROTOR

Air Line

Hose

Nozzle

Adapter

Bracket

Manual backgroundScrew

Nozzle/

Adapter

Assembly

Fuel Line

Hose

8.Install insert and rotor.

9.Check gap on rotor. Adjust to

.003"/.004" if needed (See Figure 17).

NOTE: Rotate rotor one full turn to insure the gap is .003"/.004" at tightest position. Adjust if needed.

10.Install blades, pump plate, air filters, and filter end cover.

11.Replace fan guard and upper shell.

12.Adjust pump pressure (See page 6).

NOTE: If rotor is still binding, proceed as follows.

Blade

Nozzle Adapter

Combustion Bracket Opening

Chamber

Figure 13 - Ignitor Replacement

NOZZLE ASSEMBLY

1.Remove combustion chamber and ignitor by following steps 1 through 7 under Ignitor, page 7.

2.Carefully place the ignitor in a safe location.

3.Remove two nozzle adapter bracket screws (See Figure 14).

4.Place hex-shaped aluminum nozzle adapter into vise (do not overtighten).

5.Carefully remove nozzle from nozzle adapter using 5/8" socket wrench (See Figure 15).

6.Blow compressed air through face of nozzle. This will remove any debris in nozzle.

7.Inspect nozzle seal for damage.

8.Replace nozzle into nozzle adapter until nozzle seats. Tighten 80-110 inch-pounds.

9.Attach nozzle adapter bracket to combustion chamber with two screws removed in step 3.

10.Repeat steps 9 through 16 under Ignitor, page 7.

Figure 14 - Removing Air and Fuel Line Hoses

Nozzle Face

Nozzle

Nozzle Adapter

Seal

Nozzle

Nozzle

Air Line

Adapter

Bracket

Fitting Fuel Line

 

Fitting

Figure 15 - Nozzle and Nozzle Adapter

PUMP ROTOR

(Refer to Figure 16) (Procedure if rotor is binding)

1.Remove upper shell (See page 5).

2.Remove filter end cover screws using 5/16" nut-driver.

3.Remove filter end cover and air filters.

4.Remove pump plate screws using 5/16" nut-driver.

5.Remove pump plate.

6.Remove rotor, insert, and blades.

7.Check for debris in pump. If debris is found, blow out with compressed air.

Pump Plate

Air Intake Filter

Filter End Cover

Insert

Rotor

 

Air Output Filter

 

Fan Guard

Figure 16 - Rotor Location

Blade

Gap Adjusting Screw

 

.003"/.004" Gap

 

Measured With

 

Feeler Gauge

 

Rotor

 

Gap Adjusting Screw

Figure 17 - Gap Adjusting Screw Locations

8

Page 8
Image 8
Dayton 3VG79B Dayton Portable Forced Air Heater, Maintenance Continued, Nozzle Assembly, Pump Rotor