INSTALLATION
7. When connecting the LP tank to the gas line be certain that the gas pipe is routed through the recess provided
on the top of the right side (Fig. 15). Do not route the gas pipe through the opening in the back of the Access
Drawers. Once gas connections are made, test for gas leaks.
8. On models so equipped, install the two (2) racks provided into the opening by sliding them onto the rollers on
the sidewalls of the center cavity (Fig. 16).
Fig. 14
Tank Receptacle
6. Your LP tank will be installed in the recess provided in the bottom of the right compartment (Fig. 14).
Fig. 15 Fig. 16
Drain drawer
Rack & Rack Cover
Gas Pipe Recess