INSTALLATION
CLEARANCE SPECIFICATIONS
450 INSTALLATION
MINIMUM CLEARANCES TO
SIDE VIEW
Four Bolts
| Per Bracket (installer supplied) | |
1/2" Conduit |
| |
(installer supplied) | Non Combustible | |
| ||
Utilize 2 | Surface | |
Gas Pipe | ||
bolts (min) | ||
(installer supplied)Gas | ||
per bracket. | Valve | |
| (installer supplied) | |
| Drip Leg | |
| with 1/8” NPT | |
| plugged test | |
| gage connection | |
| 18"min. | |
| 450 | |
| max. | |
96" |
| |
min. |
|
Note: Stainless steel hardware is highly recommended. Bolts in the wall should be secured to the wall studs/structure. Weight of the heater is 50 lbs.
FLOOR
11