DCS DRH-48N Clearance Specifications, Installation, Wall, Heater Mounting Body Assy, Combustible

Models: DRH-48N

1 44
Download 44 pages 56.6 Kb
Page 9
Image 9
CLEARANCE SPECIFICATIONS

INSTALLATION

CLEARANCE SPECIFICATIONS

00 & 450 INSTALLATION

MINIMUM CLEARANCES TO COMBUSTIBLE MATERIAL.

Heater Mounting Body Assy.

 

FRONT VIEW

 

Wall

 

(Combustible

 

Surface)

18"

48"

min.

 

Wall

(Combustible

Surface)

18"

min.

96" min.

Make sure the heater is level (see Warning on page 6).

FLOOR

7

Page 9
Image 9
DCS DRH-48N Clearance Specifications, 00 & 450 INSTALLATION MINIMUM CLEARANCES TO COMBUSTIBLE MATERIAL, Installation, Wall