DCS IVH-48 Site Preparation and Installation Guidelines, Finishing the Installation

Models: IVH-48

1 20
Download 20 pages 17.05 Kb
Page 8
Image 8
Site Preparation and Installation Guidelines

Site Preparation and Installation Guidelines

Site Preparation

You will need to create a secure soffit structure to mount the Island Vent Hood to the ceiling. We suggest using 1 1/2 “ by 3 1/2 “ wood cut to fit the installation as shown in the following pages. The soffit mounting to the top of the Island Vent Hood will be 10 7/8 “ in length for the DCS-IVH-48 and 10 3/4 “ for the DCS-IVH-36. These dimensions allow room for a 1/2 drywall duct cover. Do not deviate from these dimensions when choosing a duct cover as the soffit structure must align with the mounting holes on the Island Vent Hood. You are limited to a maximum of 1/2 inch on all sides.

Site Preparation NOTE: You will need to determine which type of duct cover will be used before installation and leave enough space around the soffit for a flush mount between the duct cover material and the top of the Island Vent Hood.

Finishing the Installation: CAUTION- When installing the ISLAND VENT HOOD directly to the ceiling, adequate structural supports are CRITICAL to secure the unit. The Island Vent Hood is heavy, weighing 128 LBS for the DCS-IVH 48 and 94 LBS for the DCS-IVH-36.

NOTE: The soffit height will vary according to the ceiling height.

GENERAL INSTALLATION GUIDELINES:

1)Determine the location for installation.

2)Determine the centerline of the installation.

3)If drywall is installed, cut away enough drywall to expose 2 ceiling joist (1 on each side of the Hood center line)

4)Create your soffit structure according to ceiling height and attach soffit plates for DCS-IVH-36 or soffit brackets for DCS-IVH-48 with screws to sides (see the following pages for soffits and construction).

5)Attach soffit structure to existing ceiling joist.

6)Secure soffit with soffit braces according to model type (see diagrams page 7- 10).

7)Attach Island Vent Hood to soffit with the six 2 inch mounting screws provided.

Finishing the Installation:

Once the Island Vent Hood has been mounted in place it will be necessary to install the electrical service. All electrical work should be done by a qualified electrician and must conform to all local standards. Refer to the wiring diagram on Pg. 13 for proper hook-up and grounding.

Manual background NOTE: Black=live, White=neutral, Green=ground

Complete the installation by making ductwork connections, testing unit functions, and installing & finishing drywall.

6

Page 8
Image 8
DCS IVH-48 installation instructions Site Preparation and Installation Guidelines, Finishing the Installation