19
Installation |
Pull the battery trays out using the plastic tabs and remove the battery trays (see Figure 10).
Figure 10. Removing the Battery Trays
2If installing additional UPSs, repeat Step 1 for each cabinet.
NOTE: The instructions are the same for square-hole racks and unthreaded, round-hole racks. The rails fit both
rack styles. The square-hole rack is shown in the illustrations.
3Select the proper holes in the rail for positioning the cabinet in the desired location in the rack.
The rails should be located at the bottom of the 4U space allocated for the UPS or 3U for the
EBM.
4Position the end of the left and right rails labeled FRONT facing inward.