Manuals
/
Desa
/
Household Appliance
/
Air Conditioner
Desa
B350CEA
owner manual
Parts List
Models:
B350CEA
1
21
24
24
Download
24 pages
47.8 Kb
17
18
19
20
21
22
23
24
Parts list
Diagram
Problem
Unpacking Assembly
Procedure if pump is binding
Pump Pressure Adjustment
Safety
Service Procedures
Page 21
Image 21
Page 20
Page 22
Page 21
Image 21
Page 20
Page 22
Contents
Model B350CEA Heater Size 340,000 Btu/Hr
HIGH PRESSURE PORTABLE FORCED AIR HEATER
350 SIDE PFA/PV
WARNINGS
CONTENTS SAFETY INFORMATION
DANGER
SECTION
SAFETY INFORMATION
WARNINGS Continued
Continued
UNPACKING ASSEMBLY
PRODUCT IDENTIFICATION
TOOLS NEEDED
ASSEMBLY
Continued
Figure 2 - Wheel and Handle Assembly
OPERATION
THEORY OF
Fresh Air Opening Requirements
FUELS VENTILATION
340,000 Btu/Hr
10.5
To Start Heater
OPERATION
TRANSPORTING, OR SHIPPING
STORING
To Stop Heater
To Restart Heater
PREVENTATIVE MAINTENANCE SCHEDULE
How Often
How To
TROUBLE- SHOOTING
PROBLEM
OBSERVED
POSSIBLE CAUSE
PROBLEM
High Voltage
Pump Pressure Adjustment
TROUBLE- SHOOTING
PROBLEM
REMEDY
TROUBLE- SHOOTING
Continued
Upper Shell Removal
SERVICE PROCEDURES
Fan Blades
Figure 5 - Upper Shell Removal
Nozzle
Spark Plug
Figure 7 - Spark Plug Removal
Figure 8 - Spark Plug Gap
Pump
Pump Pressure Adjustment
Fuel Lines
Procedure if pump is binding
A. Tank Fuel Filter
Fuel Filters
B. Pump Fuel Filter
Figure 15 - Removing Tank Fuel Filter
WIRING
ACCESSORY
DIAGRAM
Burner Head Assembly
PARTS LIST
Motor and Pump Assembly
DESCRIPTION
ILLUSTRATED
PARTS
BREAKDOWN
PARTS LIST
EC CONFORMITY DECLARATION DESA Europe B.V
EC CONFORMITY DECLARATION
Innsbruckweg 144, NL-3047AH Postbus
NL-3004ED Rotterdam Holland Manufacturer
Page
EQUIPMENT - LIMITED 90 DAY WARRANTY
WARRANTY AND REPAIR SERVICE
CERTIFICATE OF GENERAL
WARRANTY SERVICE
Top
Page
Image
Contents