Desa BY70CE, BY150CE, BY30CE, BY100CE owner manual Ventilation Operation, To Start Heater

Models: BY150CE BY30CE BY100CE BY70CE

1 32
Download 32 pages 12.29 Kb
Page 7
Image 7
VENTILATION

VENTILATION

OPERATION

To Start Heater WARNING

Follow the minimum fresh, outside air ventilation requirements. If proper fresh, outside air ventilation is not provided, carbon monoxide poisoning can occur. Provide proper fresh, outside air ventilation before running heater.

Provide a fresh air opening of at least 2800 square cm (three square feet) for each 100,000 BTU/Hr rating. Provide extra fresh air if more heaters are being used.

Example: A 150,000 Btu/Hr heater requires one of the following:

a two-car garage door raised 15.24 cm (six inches)

a single-car garage door raised 22.86 cm (nine inches)

two, 76.20 cm (thirty-inch) windows raised 30.48 cm (twelve inches)

Manual background WARNING

Review and understand the warnings in the Safety Information Section. They are needed to safely operate this heater. Follow all local codes when using this heater.

To Start Heater

1.Follow all ventilation and safety information.

2.Fill fuel tank with kerosene or No. 1 fuel oil.

3.Attach fuel cap.

4.Plug power cord of heater into standard 230 volt/50 hertz, grounded (earthed) outlet. Use an extension cord if needed. Use only a three-prong, grounded (earthed) extension cord.

Extension Cord Wire Size Requirements

Up to 30.5 meters (100 feet) long, use 1.0 mm2 (16 AWG) conductor

30.6 to 61 meters (101 to 200 feet) long, use 1.5 mm2 (14 AWG) conductor

Heater will start when power cord is plugged into outlet. If not, push in flame- out control reset button (see Figures 5 and 6).

Flame-Out Control

Flame-Out Control

Reset Button

Reset Button

Figure 5 - Flame-Out Control Reset

Figure 6 - Flame-Out Control Reset

Button, 30/70,000 Btu/Hr

Button, 90/150,000 Btu/Hr

 

Continued

 

 

 

7

102422

Page 7
Image 7
Desa BY70CE, BY150CE, BY30CE, BY100CE owner manual Ventilation Operation, To Start Heater