INSTALLATION

Continued

WARNING: Never modify or cover the louvered slots on the front of the firebox.

Mantel Clearances for Built-In

Installation

If placing mantel above built-in fireplace, you must meet minimum clearance between mantel shelf and top of fireplace opening.

NOTICE: Surface temperatures of adjacent walls and mantels be- come hot during operation. Walls and mantels above the firebox may become hot to the touch. If installed properly, these tem- peratures meet the requirement of the national product standard. Follow all minimum clearances shown in this manual.

NOTICE: If your installation does

not meet the minimum clear- ances shown in Figure 11, you must do one of the following:

raise the mantel to an accept- able height

remove the mantel

OPTIONAL MANTEL INSTALLATION

Refer to instructions provided with the mantel for assembly instructions. Refer to the follow- ing instructions for system installation. Refer to instructions on page 6 for hood assembly. Blower accessory should be installed prior to mantel if it is being used (see Installing Optional Blower Accessory GA3450TA, page 13).

1.

Assemble cabinet mantel as shown in acces-

 

sory instruction sheet.

2.

If blower is installed, install a properly

 

grounded, 120 volt three-prong electrical out-

 

let at fireplace location if an outlet is not there.

 

If possible, locate outlet so cabinet mantel will

 

cover it when installed (see Figure 12).

3.

Place hearth base against wall at installation

 

location. Cut an access hole in hearth base to

 

run gas line to fireplace (see Figure 12). Make

 

sure to locate access hole so cabinet mantel will

 

cover it when installed. Note: You can secure

 

base to floor using wood screws. Countersink

 

screw heads and putty over.

4.

Route flexible gas line through access hole in

 

hearth base.

5.

Center cabinet mantel on hearth base (see Figure

 

13, page 13). Make sure mantel is flush against

 

wall and centered left to right on base.

6.

Use screws provided with mantel accessory

 

to attach mantel assembly to base (see mantel

 

instruction sheet).

7.

Attach flexible gas line to fireplace gas regula-

 

tor. See Connecting to Gas Supply, page 16.

8.

Route electrical cord(s) through access holes

Note:

10"

8"

All vertical

measurements 6" are from top of

fireplace 2 1/2" opening to

bottom of mantel shelf. All measurements are in inches.

15"

18"

Mantel Shelf

21"

 

23"

 

 

 

 

 

in either side of fireplace with bushing. Plug

 

electrical cord(s) into electrical outlet.

9.

Check all gas connections for leaks. See

 

Checking Gas Connections, page 17.

10.

Carefully insert fireplace into cabinet mantel (see

 

Figure 14, page 13). Be careful not to scratch or

 

damage hearth base or cabinet mantel.

 

Pipe and Gas

Electrical

 

Outlet

Hearth

Shutoff Valve

 

Base

 

 

Side of Firebox

Figure 12 - Placing Hearth Base Against Wall

Figure 11 - Minimum Mantel Clearances

for Built-In Installation

12

www.desatech.com

111244-01F

Page 12
Image 12
Desa CDCFTNA, CDCFPR, CDCFTPA Optional Mantel Installation, Mantel Clearances for Built-In Installation, Mantel Shelf

CDCFTNA, CDCFPR, CDCFTPA specifications

Desa CDCFTPA, CDCFPR, and CDCFTNA represent a suite of advanced technologies and methodologies employed in the development and management of efficient distribution networks within the field of telecommunications and data services. These frameworks are designed to enhance connectivity, streamline processes, and ensure optimal performance in various environments.

One main feature of Desa CDCFTPA (Coaxial Digital Channel Fiber Transmission Protocol Architecture) is its ability to integrate coaxial cables with fiber optic technology, enabling high-speed data transmission over existing infrastructures. This hybrid approach not only reduces the need for extensive renovations but also capitalizes on the advantages of both technologies, offering broadband accessibility and improved bandwidth capabilities. By leveraging both mediums, operators can deliver enhanced services while maintaining cost-efficiency.

CDCFPR (Centralized Data Control Fiber Processing Resource) represents a centralized approach to managing data flow within telecommunications networks. Its core characteristic lies in its architecture, which supports dynamic allocation of resources in real-time. This enables network operators to efficiently allocate bandwidth based on demand, optimize routing paths, and reduce latency. Additionally, CDCFPR employs advanced algorithms for data compression and encryption, ensuring that users experience a seamless and secure connection.

CDCFTNA (Carrier Digital Channel Fiber Transmission Network Architecture) is focused on creating robust networks that can support a variety of distribution channels, including 5G and IoT devices. Its design emphasizes scalability and adaptability, allowing network providers to easily expand or modify their infrastructure to meet evolving market needs. Key technologies incorporated in CDCFTNA include Software-Defined Networking (SDN) and Network Function Virtualization (NFV), which enable operators to manage their resources more flexibly and efficiently.

Each of these frameworks boasts unique characteristics that contribute to the overall enhancement of telecommunications systems. They embody a commitment to innovation, sustainability, and user-centric design, aligning with current trends in digital services and communication technologies. By deploying such advanced systems, service providers can ensure they remain competitive in a fast-paced and continuously evolving market. In summary, Desa CDCFTPA, CDCFPR, and CDCFTNA collectively represent the future of telecommunications infrastructure, promising improved connectivity, efficiency, and adaptability for a diverse range of applications.